01

What the evidence says

Solar production and backup capability are separate design questions.

A battery label alone does not prove seamless transfer, motor-start capability or safe island operation.

02

What a business should do next

  1. Define critical loads, interruption tolerance and restart sequence.
  2. Require an integrated outage and recovery acceptance test.