Local-first Victron and Node-RED automation for Philippine farms and remote sites
Build understandable automation around measured states: aerator and pump priority, generator start and cool-down, battery reserve, tank level, temperature, tariff windows, alarms and safe manual fallback—even when the internet is unavailable.
SOLAR + BESSVictron Node-RED automation PhilippinesPhilippinesFree initial review
01
When this matters
Operators need a simple local sequence that coordinates energy equipment with production conditions, but the present site relies on manual switching, disconnected alarms or opaque cloud-only rules.
The decision crosses operating, electrical, commercial or regulatory boundaries.
Management needs a defensible next step before committing capital.
02
What we evaluate
We define inputs, writable outputs, interlocks, state persistence, timing, alarm priority, loss-of-sensor and loss-of-network behavior, user roles, credentials handling, change control and a manual mode before building a flow.
Available bills, interval data, drawings, settings, contracts and operating records.
Assumptions, contradictions, missing evidence and the party responsible for each dependency.
03
What you receive
A documented flow, state and alarm matrix, operator dashboard, backup and restore file, test script, security boundary, training notes and measured acceptance record for normal, fault and communications-loss cases.
A decision memo that separates verified facts from assumptions.
Prioritized actions, owners and acceptance evidence for the next stage.
A controlled path from question to evidence
Question → evidence → decision → acceptance
Every scope states what is known, what remains open, who owns the dependency and how the result will be verified.
01
BaselineBills, interval data, operating modes and critical loads
02
OptionsNo-project, efficiency, controls, solar, BESS and backup
03
RiskProtection, fire, data, cyber, warranty and service
04
VerificationKPIs, FAT/SAT, commissioning and operating evidence
Policies, standards and product applicability can change. Confirm the current text, project classification and competent authority before procurement, import or investment.
Tell us what you need to improve: electricity cost, reliable power, an existing system or a public procurement. We start with a no-obligation desktop review of the information you provide.