Interval metering plan

Metering plan for investment-grade energy decisions

Choose meter boundaries, variables, sample rates, time synchronization, retention and quality checks according to the decision—not the dashboard.

DECISION FILESERVICEReviewed 2 September 2026
SOLAR + BESSInterval metering planPhilippinesFree initial review
01

When this matters

  • The business lacks interval data or has many meters with unclear boundaries and timestamps.
  • The decision crosses operating, electrical, commercial or regulatory boundaries.
  • Management needs a defensible next step before committing capital.
02

What we evaluate

  • For Interval metering plan, we test the site data, interfaces, operating limits, commercial assumptions and evidence needed for acceptance.
  • Available bills, interval data, drawings, settings, contracts and operating records.
  • Assumptions, contradictions, missing evidence and the party responsible for each dependency.
03

What you receive

  • A project-specific interval metering plan scope with priorities, owners, open dependencies and measurable acceptance criteria.
  • A decision memo that separates verified facts from assumptions.
  • Prioritized actions, owners and acceptance evidence for the next stage.

A controlled path from question to evidence

Question → evidence → decision → acceptance

Every scope states what is known, what remains open, who owns the dependency and how the result will be verified.

  1. 01
    BaselineBills, interval data, operating modes and critical loads
  2. 02
    OptionsNo-project, efficiency, controls, solar, BESS and backup
  3. 03
    RiskProtection, fire, data, cyber, warranty and service
  4. 04
    VerificationKPIs, FAT/SAT, commissioning and operating evidence

Philippine decision paths

Continue with a related question.

Explore all

Start with clarity, not a purchase

Free initial solar + BESS assessment

Tell us what you need to improve: electricity cost, reliable power, an existing system or a public procurement. We start with a no-obligation desktop review of the information you provide.

01

Start with clarity, not a purchase

Free initial solar + BESS assessment

Tell us what you need to improve: electricity cost, reliable power, an existing system or a public procurement. We start with a no-obligation desktop review of the information you provide.

First: free initial assessment

You receive a short response identifying the apparent priority, missing information and a recommended next step. No site visit, measurements, engineering design, legal opinion or certification is included.

If useful: an agreed engineering scope

Only after the free assessment, we can send a separate proposal with scope, deliverables, fee and timing. It can cover measured loads, solar yield, BESS sizing, tender risks, cybersecurity or lifecycle cost. Nothing starts until you approve it.

Do not attach bills, diagrams, credentials or other sensitive files here. We will agree a secure transfer route after initial contact.

The initial desktop assessment is free. Any detailed work begins only after you approve a separate scope and proposal.

Public entities: preliminary contact does not confer preferred-bidder status or authorize an award. Any subsequent engagement must follow the applicable procurement process.