Anonymized project evidence

Philippine energy case studies nang hindi inilalantad ang client

Ibinabahagi ang transferable lessons pero hindi ang exact location, tao, company identity at sensitive values.

DECISION FILECASESinuri noong 2 Setyembre 2026
SOLAR + BESSAnonymized project evidencePhilippinesLibreng initial review
01

Kailan ito mahalaga

  • Gusto ng operators ng proof of method nang hindi inilalantad ang ibang client.
  • Magkakaugnay ang operating, electrical, commercial o regulatory na desisyon.
  • Kailangan ng management ng mapapatunayang next step bago mag-commit ng capital.
02

Ano ang sinusuri namin

  • Ibinubukod ang measured results, observed changes, modelled opportunities at unverified claims.
  • Available bills, interval data, drawings, settings, contracts at operating records.
  • Assumptions, contradictions, kulang na ebidensya at owner ng bawat dependency.
03

Ano ang matatanggap

  • Concise evidence chain na magagamit ng ibang facility sa sariling diagnostic.
  • Decision memo na naghihiwalay ng verified facts at assumptions.
  • Prioritized actions, owners at acceptance evidence para sa next stage.

Kontroladong proseso mula tanong hanggang ebidensya

Tanong → ebidensya → desisyon → acceptance

Malinaw sa bawat scope kung ano ang verified, ano ang open, sino ang owner at paano ive-verify ang resulta.

  1. 01
    BaselineBills, interval data, operating modes at critical loads
  2. 02
    OptionsNo-project, efficiency, controls, solar, BESS at backup
  3. 03
    RiskProtection, fire, data, cyber, warranty at service
  4. 04
    VerificationKPIs, FAT/SAT, commissioning at operating evidence

European experience • Philippine application

Solar experience mula 2009. Lokal na desisyon, hindi kinopyang design.

Ang Philippine advisory work namin ay humuhugot sa European solar experience mula 2009 na dokumentado ng Solarni Panely.CZ: solar, storage, backup at commissioning. European experience ang tinutukoy ng petsa, hindi ang incorporation ng Secure Solar Systems Inc. o pagsisimula ng operasyon sa Pilipinas.

Battery cabinets habang ini-install sa Brno, Czechia; hindi final handover condition

985.6 kWh battery reference • Czechia

Nakatala sa source ang 64 × 15.4 kWh BYD modules para sa backup at solar storage. Installation ang larawan, hindi final safety inspection. European reference ito, hindi Philippine project o pangako ng usable AC capacity.

Tingnan ang source reference
European rooftop PV mula sa project archive ng Solarni Panely.CZ

Rooftop PV • European project archive

Aktuwal na rooftop installation ang Kociánka reference. Para sa Pilipinas, kailangan ng sariling assessment ng roof structure, wind, corrosion, drainage, access at electrical interfaces. Hindi patunay ng typhoon certification o transferable savings ang larawan.

Tingnan ang source reference

Source: European experience mula 2009 · Mga larawan: Solarni Panely.CZ project archive. Walang ipinapalagay na client savings o performance results.

Mga Philippine decision path • 1

Philippine energy case studies nang hindi inilalantad ang client

Unahin ang kalinawan, hindi ang pagbili

Libreng paunang solar + BESS assessment

Sabihin kung ano ang nais ayusin: gastos sa kuryente, maaasahang power, kasalukuyang system o public procurement. Magsisimula tayo sa desktop review ng inyong impormasyon, na walang obligasyong bumili.

01

Unahin ang kalinawan, hindi ang pagbili

Libreng paunang solar + BESS assessment

Sabihin kung ano ang nais ayusin: gastos sa kuryente, maaasahang power, kasalukuyang system o public procurement. Magsisimula tayo sa desktop review ng inyong impormasyon, na walang obligasyong bumili.

Una: libreng paunang pagsusuri

Makakatanggap kayo ng maikling tugon tungkol sa nakikitang priority, kulang na impormasyon at susunod na hakbang. Hindi kasama ang site visit, measurements, engineering design, legal opinion o certification.

Kung kapaki-pakinabang: napagkasunduang engineering scope

Pagkatapos lamang ng libreng assessment, maaari kaming magpadala ng hiwalay na proposal na may scope, deliverables, bayad at iskedyul. Walang detalyadong trabaho na magsisimula hangga’t hindi ninyo ito inaaprubahan.

Huwag mag-attach dito ng bills, diagrams, credentials o sensitive files. Magkakasundo muna tayo sa secure transfer route.

Libre ang paunang desktop assessment. Magsisimula lamang ang detalyadong trabaho pagkatapos ninyong aprubahan ang hiwalay na scope at proposal.

Para sa public entities: hindi nagbibigay ng preferred-bidder status o awtoridad sa award ang paunang contact. Ang anumang susunod na engagement ay dapat sumunod sa naaangkop na procurement process.