Commercial energy services

Solar, BESS at energy advisory services para sa Philippine businesses

Piliin ang pinakamaliit na evidence-led engagement para maresolba ang susunod na investment, procurement o operating decision.

DECISION FILESERVICESinuri noong 2 Setyembre 2026
SOLAR + BESSCommercial energy servicesPhilippinesLibreng initial review
01

Kailan ito mahalaga

  • Maraming posibleng intervention pero walang reliable priority.
  • Magkakaugnay ang operating, electrical, commercial o regulatory na desisyon.
  • Kailangan ng management ng mapapatunayang next step bago mag-commit ng capital.
02

Ano ang sinusuri namin

  • Inihahambing ang no-project, efficiency, controls, solar, BESS at continuity sa iisang baseline.
  • Available bills, interval data, drawings, settings, contracts at operating records.
  • Assumptions, contradictions, kulang na ebidensya at owner ng bawat dependency.
03

Ano ang matatanggap

  • Scoped entry diagnostic at route sa feasibility, specification o acceptance testing.
  • Decision memo na naghihiwalay ng verified facts at assumptions.
  • Prioritized actions, owners at acceptance evidence para sa next stage.

Kontroladong proseso mula tanong hanggang ebidensya

Tanong → ebidensya → desisyon → acceptance

Malinaw sa bawat scope kung ano ang verified, ano ang open, sino ang owner at paano ive-verify ang resulta.

  1. 01
    BaselineBills, interval data, operating modes at critical loads
  2. 02
    OptionsNo-project, efficiency, controls, solar, BESS at backup
  3. 03
    RiskProtection, fire, data, cyber, warranty at service
  4. 04
    VerificationKPIs, FAT/SAT, commissioning at operating evidence

LGU • public facilities • procurement teams

Bago ang solar o BESS tender, suriin ang technical at cyber risks.

Para sa municipal engineers, mayor’s office at BAC: linawin ang pangangailangan, suriin ang assumptions at tukuyin ang acceptance evidence. Magsimula sa libreng paunang review.

Public-sector review

Mga Philippine decision path • 64

Solar, BESS at energy advisory services para sa Philippine businesses

01

Libreng paunang assessment

Business energy diagnostic mula sa aktuwal na operating data

02

RA 11285 readiness

Energy audit readiness para sa Philippine designated establishments

03

Buyer-side review

Independent review ng solar o BESS proposal bago pumirma

04

Storage business case

BESS feasibility batay sa load, power at operational value

05

C&I solar

Commercial solar na dinisenyo ayon sa self-consumption at constraints

06

Bagong 2026 route

Zero-export solar para sa own-use sa ilalim ng 2026 Philippine policy

07

Demand at power quality

Peak demand, power factor at power-quality analysis

08

Brownout resilience

Business continuity engineering para sa brownouts at weak grids

09

Cyber-physical audit

BESS cybersecurity, data at local-control audit

10

Acceptance evidence

BESS FAT, SAT, commissioning at operating verification

11

Investment-grade solar study

Commercial solar feasibility study para sa Philippine facilities

12

Storage investment due diligence

Independent BESS technical at commercial due diligence

13

Independent technical audit

Technical audit ng operating solar o BESS system

14

Interval data analysis

Load profile analysis para sa solar, BESS at demand decisions

15

Electricity bill intelligence

Philippine commercial electricity bill at tariff analysis

16

Power quality opportunity

Power factor, voltage at electrical loss assessment

17

Project recovery

I-recover ang delayed o underperforming solar at BESS project

18

Buyer-side commissioning

Independent commissioning witness para sa solar at BESS

19

Savings verification

Measurement at verification para sa energy projects

20

Metering at local control

Energy monitoring at automation na patuloy na gumagana locally

21

Facility microgrid study

Microgrid feasibility para sa island, weak-grid at critical facilities

22

Hybrid power controls

Generator at BESS coordination para sa reliable backup

23

Business continuity engineering

Critical load at outage autonomy study

24

BESS fire at emergency readiness

Buyer-side BESS fire safety at emergency response review

25

Cebu business energy

Commercial solar, BESS at energy audits para sa Cebu businesses

26

Luzon business energy

Solar, BESS at energy risk decisions para sa Luzon facilities

27

Solar owner's engineer

Solar owner's engineering para sa Philippine commercial projects

28

BESS owner's engineer

BESS owner's engineering mula specification hanggang acceptance

29

Solar procurement support

Commercial solar procurement support at tender control

30

BESS procurement support

BESS procurement specification at bid evaluation Philippines

31

Bid normalization

I-normalize ang solar at BESS bids bago commercial comparison

32

Solar performance audit

Commercial solar performance at underproduction audit

33

BESS performance testing

BESS capacity, power, efficiency at response testing

34

Solar roof readiness

Commercial roof readiness bago solar tender

35

Transformer capacity

Transformer capacity assessment para sa solar, BESS at new loads

36

Protection coordination

Protection coordination review para sa solar, BESS at hybrid systems

37

Harmonic analysis

Harmonic at power quality analysis para sa industrial facilities

38

Motor-start study

Motor-start at voltage-dip study para sa backup at microgrids

39

Compressed-air audit

Industrial compressed-air energy assessment

40

Refrigeration audit

Industrial refrigeration at cold-chain energy audit

41

HVAC at cooling efficiency

HVAC at cooling energy optimization para sa commercial buildings

42

RA 11285 energy management

Operational energy management support sa ilalim ng RA 11285

43

Interval metering plan

Metering plan para sa investment-grade energy decisions

44

Solar O&M takeover

Take over monitoring at O&M ng existing commercial solar plant

45

BESS O&M readiness

BESS operations, maintenance at service readiness review

46

Warranty claim evidence

Evidence preparation para sa solar at BESS warranty claims

47

Visayas business energy

Commercial solar, BESS at resilience sa Visayas

48

Mindanao business energy

Industrial solar, BESS at energy diagnostics sa Mindanao

49

Batangas industrial energy

Industrial solar, BESS at power quality sa Batangas

50

Laguna at Cavite industry

Factory solar at BESS decisions sa Laguna at Cavite

51

Davao commercial energy

Commercial solar, BESS at continuity planning sa Davao

52

Palawan island power

Hybrid solar, BESS at diesel optimization sa Palawan

53

Solar financing readiness

Commercial solar financing readiness review Philippines

54

ROI sensitivity analysis

Solar at BESS ROI sensitivity analysis para sa Philippine businesses

55

Single-line diagram review

Solar at BESS electrical single-line diagram review

56

Insurance risk review

Solar at BESS technical insurance risk review

57

EPC technical contract review

Solar at BESS EPC contract technical schedule review

58

Battery site readiness

BESS container site readiness assessment Philippines

59

BESS service at maintenance Philippines

Commercial BESS service, condition review at performance recovery

60

BESS module imbalance diagnostics

I-diagnose ang cell at module imbalance bago maging lost BESS capacity

61

Legacy solar at battery retrofit

I-retrofit at i-repower ang lumang solar, inverter o battery system

62

Legacy system upgrade sa Victron

I-upgrade ang selected legacy off-grid at backup systems sa serviceable Victron platform

63

Victron Node-RED automation Philippines

Local-first Victron at Node-RED automation para sa Philippine farms at remote sites

64

Public-sector solar + BESS advisory

Pagsusuri ng solar at BESS public procurement sa Pilipinas

Unahin ang kalinawan, hindi ang pagbili

Libreng paunang solar + BESS assessment

Sabihin kung ano ang nais ayusin: gastos sa kuryente, maaasahang power, kasalukuyang system o public procurement. Magsisimula tayo sa desktop review ng inyong impormasyon, na walang obligasyong bumili.

01

Unahin ang kalinawan, hindi ang pagbili

Libreng paunang solar + BESS assessment

Sabihin kung ano ang nais ayusin: gastos sa kuryente, maaasahang power, kasalukuyang system o public procurement. Magsisimula tayo sa desktop review ng inyong impormasyon, na walang obligasyong bumili.

Una: libreng paunang pagsusuri

Makakatanggap kayo ng maikling tugon tungkol sa nakikitang priority, kulang na impormasyon at susunod na hakbang. Hindi kasama ang site visit, measurements, engineering design, legal opinion o certification.

Kung kapaki-pakinabang: napagkasunduang engineering scope

Pagkatapos lamang ng libreng assessment, maaari kaming magpadala ng hiwalay na proposal na may scope, deliverables, bayad at iskedyul. Walang detalyadong trabaho na magsisimula hangga’t hindi ninyo ito inaaprubahan.

Huwag mag-attach dito ng bills, diagrams, credentials o sensitive files. Magkakasundo muna tayo sa secure transfer route.

Libre ang paunang desktop assessment. Magsisimula lamang ang detalyadong trabaho pagkatapos ninyong aprubahan ang hiwalay na scope at proposal.

Para sa public entities: hindi nagbibigay ng preferred-bidder status o awtoridad sa award ang paunang contact. Ang anumang susunod na engagement ay dapat sumunod sa naaangkop na procurement process.