Independent engineering guide
Basaha ang architecture—dili lamang ang label.
Gibulag sa guide ang nameplate language gikan sa operating evidence nga gikinahanglan sa Philippine buyer. Educational decision support kini; kinahanglan kumpirmahon ang exact design, availability, certification ug authority route alang sa model ug site.
kW • kWh • V • A • Hz
Unsa gyud ang teknolohiya
Ang Innagator C&I storage family nga adunay current variants sa kW ug kWh. Kinahanglan ihigot ang PCS power, battery energy, enclosure ug controls sa usa ka exact offered configuration sa wala pa itandi.
Susihon ang current Innagator 100 kW, 250 kW ug 400 kWh catalogue variants isip candidate architectures—dili local availability promise—apil ang PCS, enclosure, protection, EMS, fire, transport ug support.
LOAD • DUTY • INTERFACE
Asa kini makahimo og value
Mahimong ikonsiderar kini sa industrial peak management, solar shifting o resilience kon kinahanglan ang packaged C&I power. Kinahanglan itakda sa use case ang power-to-energy ratio, reserve, grid mode ug expansion.
- Ang dako nga C&I storage nanginahanglan og model-specific evidence ug klarong Philippine import, authority ug service route sa wala pa procurement.
- Nagkadugtong ang operating, electrical, commercial o regulatory nga desisyon.
- Kinahanglan sa management og mapamatud-ang next step sa wala pa mag-commit og capital.
HEAT • SURGE • CONTROL • SERVICE
Unsay kasagarang makaguba sa business case
Ang pagtratar sa 100 kW, 250 kW ug 400 kWh references isip interchangeable makahimo og false comparison. Mahimong lahi ang duration, interface, enclosure, fire, auxiliaries, software ug shipping.
- Alang sa Sunsynk Innagator C&I BESS, susihon ang site data, interfaces, operating limits, commercial assumptions ug acceptance evidence.
- Available bills, interval data, drawings, settings, contracts ug operating records.
- Assumptions, contradictions, kulang nga ebidensya ug owner sa matag dependency.
SPECIFY • CONTRACT • TEST
Ebidensya nga pangayoon sa wala pa binding offer
I-normalize ang bids sa exact PCS/usable energy, drawings, environmental derating, safety evidence, HVAC/auxiliaries, EMS, cyber/data ownership, Philippine import/authority route, service, spares, FAT/SAT ug guarantees.
- Project-specific Sunsynk Innagator C&I BESS scope nga adunay priorities, owners, open dependencies ug measurable acceptance criteria.
- Decision memo nga nagbulag sa verified facts ug assumptions.
- Prioritized actions, owners ug acceptance evidence alang sa next stage.
RLHS • DECISION LEDGER
Upat ka pangutana aron measurable ang procurement
- 01INPUT
Unsang measured site data ang nagtakda sa duty?
- 02INTERFACE
Unsang voltage, protection, control ug data boundaries ang kinahanglan mohaom?
- 03GUARANTEE
Unsang usable result ang kontraktuwal nga gisaad sa end of life?
- 04TEST
Unsaon pagsaksi sa operating result ug failure recovery?