Independent technical audit
Technical audit sa operating solar o BESS system Imbestigahan ang underperformance, alarms, unsafe workarounds, data gaps, protection ug contractor scope.
DECISION FILE SERVICE Gisusi niadtong 2 Setyembre 2026
SOLAR + BESS Independent technical audit Philippines Libreng unang review
01 Kanus-a kini importante Lahi ang actual operation sa proposal, guarantee o commissioning record. Nagkadugtong ang operating, electrical, commercial o regulatory nga desisyon. Kinahanglan sa management og mapamatud-ang next step sa wala pa mag-commit og capital. I-reconcile ang drawings, settings, logs, measurements, alarms, maintenance ug acceptance criteria. Available bills, interval data, drawings, settings, contracts ug operating records. Assumptions, contradictions, kulang nga ebidensya ug owner sa matag dependency. Evidence-backed findings nga naka-rank sa safety, availability, value ug recoverability. Decision memo nga nagbulag sa verified facts ug assumptions. Prioritized actions, owners ug acceptance evidence alang sa next stage.Kontroladong proseso gikan sa pangutana ngadto sa ebidensya
Pangutana → ebidensya → desisyon → acceptance Klaro sa matag scope unsay verified, unsay open, kinsa ang owner ug unsaon pag-verify sa resulta.
01 Baseline Bills, interval data, operating modes ug critical loads
02 Options No-project, efficiency, controls, solar, BESS ug backup
03 Risk Protection, fire, data, cyber, warranty ug service
04 Verification KPIs, FAT/SAT, commissioning ug operating evidence
Mga Philippine decision path
Padayon sa may kalabotang pangutana. Tan-awa tanan →